Journey 38: understanding where a project is at
A person, or an agent acting as lead, asks: how far along is this phase, what is moving, what is stuck, is main healthy? Issue a0cf8c22 lists "understand where a project is at" in the core loop. The planning design began with this question ("The owner kept asking what is the status of this phase, and the answer lived in a lead agent's private log"). Journey 8 maps planning; journey 17 maps news; this file maps the summary.
Walked: planning with counts:true, queue, lanes, nforge status, check-settings (main audit), landings, nforge metrics --report as read in journey 9, the Now and planning sources, the planning design pack and the open Issues b7a0dff1 and d3357f40. Not walked: a rendered planning page.
Steps today
| # | Question | Agent or terminal | Person on the web |
|---|---|---|---|
| 1 | How far along is this Initiative? | planning '{"initiativeId":"…","counts":true}' returns five status counts, their total and coverage. The maintained path uses one read. | Plan's Initiative headers and detail show the same progress counts. A + marks a lower bound when the bounded read cannot prove completeness. |
| 2 | What is in motion right now? | lanes '{"limit":N}' (actor, Item title, last save, latest landing, state); queue '{}' → total, each entry with position, landingState:{"state":"checking","label":"Checking","nextStep":"The check is running on this Candidate; wait for its result."} and intentTitle. (ran) | Now → What's changing, with the journey rail per Lane; Who's working. |
| 3 | What is stuck? | No single read. Dormant Lanes: lanes '{"view":"dormant"}'. Held landings sit in queue "without a position". Stalls raise an alert. | Needs you (journey 27). "Quiet Lanes expand from one summary line." |
| 4 | Is main healthy? | check-settings → mainAudit: result:"passed", redMinutes:0, lastGreen, landing.label:"Fast landing", window:{"audits":50,"red":0}. (ran) | Not found as a line on Now (journey 30, J30-6). |
| 5 | What landed lately? | landings '{"from":"…","to":"…"}' (no titles; journey 18, J18-6). | Now → "Accepted today"; the ledger "What landed on main". |
| 6 | Is my copy current? | nforge status . → "Forge clone: current with main." One line, for people. (ran) | n/a |
| 7 | How fast and how costly is it going? | nforge metrics --report (journey 9). | No page. |
| 8 | One sentence for the whole project | None. The planning design proposes a one-liner per Initiative "assembled from events and never written by a model: Phase: 14 of 19 landed, 3 in flight, 2 waiting on owner", and an agent action plan status (unshipped). | None. |
| 9 | Burn-up, flow, swimlanes | None. Listed as ideas in the planning design ("burn-up per Initiative … cumulative flow … progress swimlanes"). | None. |
| 10 | Across projects | None (journey 22). | Home: a count of what needs you and "N working" per project. |
Findings
| Id | Severity | Finding | Evidence |
|---|---|---|---|
| J38-1 | S1 | Plan now shows where an Initiative stands. The five counts agree with the CLI and MCP for covered Initiatives, including Items outside the displayed rows (b7a0dff1). | fixture, docs |
| J38-2 | S2 | The counts use the stored status words, not the ones people will see. open, in-progress, closed, proposed, abandoned against the decided Proposed, Planned, In motion, Done, Abandoned (journey 8, J8-3). "122 open" hides how many are planned and how many nobody has looked at. | ran |
| J38-3 | S2 | Progress, motion, health and blockage live in five reads. planning, lanes, queue, check-settings and Needs you each hold one part. A lead agent asked "where are we?" runs all five and writes the sentence itself, which costs tokens and differs every time. | ran |
| J38-4 | S2 | "Stuck" is not a state. A Lane idle for two days is dormant. A landing held for a person has no queue position. A check that never reports is stalled after 15 minutes. An Item in motion with no save for a week is nothing in particular. A person asking "what is stuck?" has no list (journey 5 names the same gap). | ran, docs |
| J38-5 | S2 | Counts say how many, not whether it is going well. 20 closed of 160 could be healthy or late. Forge records landings per day, first-try rate and time to main (journey 9, J9-9); none is joined to an Initiative. | ran |
| J38-6 | S2 | An Initiative's own summary is prose kept by hand. The Phase 7 Initiative body lists what to run first, the dated re-checks and triage notes, typed by a lead. It is the real status page of the project and is edited by put-planning-item with no structure. | ran |
| J38-7 | S3 | nforge status is the one command that answers a person in a sentence, and it answers the smallest question (is my folder current). The same form would suit the larger ones. | ran |
| J38-8 | S3 | coverage on the counts is easy to miss. The schedule read returned coverage:"partial"; a reader who ignores the field takes a partial count as the whole. | ran |
Dead ends
- "What is stuck?"
- "Will this Initiative finish, at this rate?"
Naming and tone
- Status means a project's progress, an Item's state, a Lane's state, a landing's state, a clone's freshness, service health and a document (
docs/status.md). - The design pack's one-liner is in the right voice: counts, no adjectives.
What each persona needs
- Agent, not person: one read that returns the sentence and the numbers for an Initiative or the project, cheaply, so it never composes status prose from five reads.
- Person, not agent: per Initiative: done, in motion, waiting on me, not started; what is stuck and why; whether main is green; a trend. On one screen, and on a phone.
Questions for the owner
- What is the one line per Initiative, exactly? A proposal from the design pack: "14 of 19 landed, 3 in motion, 2 waiting on you".
- Is "stuck" a defined state with a rule (for example: in motion, no save for N days; or held for a person for N hours)?
- Does the project summary include main's health and the queue, or only planning progress?
- Is a trend wanted (landings per day against scope), or are counts enough for the first version?
- Is the Initiative's hand-written summary kept as a pinned note beside the generated line?